• <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <table id="y4y0w"><option id="y4y0w"></option></table>
  • <li id="y4y0w"></li>
    <noscript id="y4y0w"></noscript>
    <noscript id="y4y0w"><kbd id="y4y0w"></kbd></noscript>
    <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <menu id="y4y0w"></menu>
    <table id="y4y0w"><rt id="y4y0w"></rt></table>
  • 150t鋼包精煉過程的物理模擬

    Physical model of 150t ladle refining process

    • 摘要: 在相似原理的基礎上,對天津鋼管公司150t鋼包精煉吹氬過程進行了水模擬實驗(模型、原型幾何比例為1:4).實驗發現,原型鋼包吹氬位置不盡合理,透氣磚頂面面積偏小,吹氬流量偏大.通過對以上三指標的優化,確定合理的吹氬工藝參數為:將吹氬孔位置由原來的距鋼包底中心分別為0.555R和0.634R移動到1/3R處,將透氣磚頂面直徑由原來的16mm擴大到35mm,吹氬流量減少到0.44m3·h-1.水模擬實驗為原型鋼包的工藝改進提供了依據.

       

      Abstract: Based on the similar principle, water modeling experiment was carried out for the 150 t ladle furnace at Tianjin Pipe Corporation Ltd. (the geometry ratio is 1:4 between the model and prototype). It was found that the holes' positions weren't rational completely, porous brick was small, and gas flow rate was a little large. The rational argon blowing process is determined by optimizing experiments:the holes are moved to the position of 1/3R, the top diameter of porous brick is increased to 35 mm from 16 mm, and the gas flux is con-trolled to 0.44m3·h-1. The results provide references for the improvement of actual ladle.

       

    /

    返回文章
    返回
  • <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <table id="y4y0w"><option id="y4y0w"></option></table>
  • <li id="y4y0w"></li>
    <noscript id="y4y0w"></noscript>
    <noscript id="y4y0w"><kbd id="y4y0w"></kbd></noscript>
    <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <menu id="y4y0w"></menu>
    <table id="y4y0w"><rt id="y4y0w"></rt></table>
  • 啪啪啪视频