• <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <table id="y4y0w"><option id="y4y0w"></option></table>
  • <li id="y4y0w"></li>
    <noscript id="y4y0w"></noscript>
    <noscript id="y4y0w"><kbd id="y4y0w"></kbd></noscript>
    <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <menu id="y4y0w"></menu>
    <table id="y4y0w"><rt id="y4y0w"></rt></table>
  • 深海采礦揚礦硬管彈性體建模分析

    Elasticity Module Analysis of Kinematics and Dynamic Responseof a Mining Pipe

    • 摘要: 深海采礦系統中,揚礦管受采礦船的航行速度及海浪、海流等因素的影響會發生橫向偏移的問題.對帶有集中質量的階梯式揚礦管的橫向偏移進行了建模,并用枷遼金(Galerkin)方法進行求解,通過計算機的模擬計算,分析了揚礦管在不同情況下橫向偏移的特性.

       

      Abstract: Deflective displacement of a mining pipe under the dragging force of the vessel and the combining effects of winds, waves, and currents were discussed. Mathematical modules of deflective displacement of a ladder pipe with pumps and buffer were built, and the equations were solved by Galerkin method. Simulated by computer, the characteristics of dynamic responses of a mining pipe under various conditions were analyzed.

       

    /

    返回文章
    返回
  • <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <table id="y4y0w"><option id="y4y0w"></option></table>
  • <li id="y4y0w"></li>
    <noscript id="y4y0w"></noscript>
    <noscript id="y4y0w"><kbd id="y4y0w"></kbd></noscript>
    <noscript id="y4y0w"><source id="y4y0w"></source></noscript>
    <menu id="y4y0w"></menu>
    <table id="y4y0w"><rt id="y4y0w"></rt></table>
  • 啪啪啪视频